Sunday, June 27, 2010

The Final(ish) Plans

Well, it's been quite a process since the first time I measured the house out and modeled it in Sketchup. We've been through about four major designs and I have over ten models saved with at least small differences between them. The plans are now mostly finalized. I say mostly because the changes that will occur from now on will probably be based on decisions we make when we come closer to physically working on them. I've just been told by so many experienced people to plan as much as possible ahead of time, so here it goes:


Bird's eye view of the property. We don't have much planned in the way of landscaping yet, but the garden that you see on the left side is already there, as is the shed. It's a very special shed that I'll talk about later in this post. 



I just recently got Podium, a rendering plugin for Google Sketchup. I'm not very good with it yet and I really don't know why it cut off half of our fig tree, but I'll figure it out soon. 


The main change you'll see here is that the front door will be moved to the actual front of the house. Some of the odd shaped windows on that side will probably be replaced with ones that can open and the south side of the house will get another window or two. 


Rather than doing that expensive and unneeded addition, we're pouring a 12' x 21' patio outback and giving it a good, solid cover. It may rain a lot here, but it as long as you're dry, it's rarely too cold to cook and entertain outside. The upstairs deck will get rebuilt slightly bigger than it was. 



These labels are hard to read so I'll break down the floor plan:

First Story:
  • Entry (top right). Moved to where the old gas furnace was. Storage area under stairs may be used for HVAC equipment. 
  • Living Room (bottom right). Stays the same size, but the wall between it and the kitchen is almost completely opened up and a bar is put in. 
  • Kitchen (bottom left). The main difference here is that we're stealing space from the bathroom to create a nook for the fridge and some additional storage. 
  • Bathroom (top left). Entry is now from the adjacent hallway which will be created. Still a full bath, but going to standing shower only because of decreased space. 
  • Laundry Room (above bathroom). This is where the solar panel equipment will be mounted to the walls and it may have to house some of the HVAC equipment if it won't go under the stairs. 
  • Bedroom (top middle). Slightly smaller because of the new hallway. If the bedroom and bathroom doors can go more toward the front of the hallway, the back of it will be converted into closet space for the bedroom. Otherwise, we'll have to cut into the entry way. 

Second Story is pretty much unchanged for now. The only thing different about this model is that I squared off the triangle shaped piece of floor near the top of the stairs so it could be a closet. 

I feel like most of the work I'm doing and these plans for structural changes are basically bringing the house to more of a blank slate. As we approach that mark, we'll be getting more into the selection of finish products, colors, etc. Some of those things have already been discussed, decided on, or even started. Each of them will have their own post, but here is a run down of what I know so far:

Garden - This is built and planted. Right now we have about 300 SF, but we may add more later. We picked up a big variety of organic plant starts at Portland Nursery and some excellent organic soil and top dressing from Dean Innovations. 

Water Shed - This is the shed I mentioned early that sits in the far back corner of the property. I'll be going into great detail about this in another post, but it's essentially a self-contained rainwater harvesting building. The roof is designed to catch enough water to fill a 3,200 gallon tank during the rainy season, which is enough to water our garden during the rainy season. I'm involved with the creation, sales, and marketing of this product and this is our very first one. More info can be found at watersheddesigns.com.

Solar Array - The solar array pictured is a 2 KW Photovoltaic (provides electricity) set and a 2 KW Solar Thermal (heats water) set. I'll go into more detail later on about how the electric panels are tied into the power grid and how the hot water panels are tied into the heating system. 

Roof - We aren't sure about the color, but I'll be putting on a standing seam metal roof before we can mount the solar panels. 

Insulation - I haven't had a chance to study the roof / ceiling assembly yet, but I'll need to find a way to add more insulation. As for the walls, it looks like we'll be using 2" x 2" battens on the outside to increase the wall depth. We have some options at that point for insulation, but we'll probably leave the existing 4" alone and just add 2" of rigid foam board in between the battens. This, of course, will be done after ripping off the old siding, but we have yet to pick out a new siding material. 

Kitchen - We really wanted to keep the look of the kitchen warm and classic. We're painting and reusing the lower cabinets and replacing the counters with Paper Stone. The upper cabinets will be replaced with open shelving. We're going to try to refinish the old wood floors if they're salvageable. Appliances will all be white. We have the fridge already and we just bought a vintage gas stove that looks sort of like this:


Annie is very excited about the stove and we're both really looking forward to having a functional kitchen again. 

HVAC System - This is still up in the air, but what we want to put in is a forced air (ducted) system which is heated by a hydronic air handler. The hydronic air handler uses hot water running through a copper coil to heat the home's air, rather than a gas flame. Whatever system we use, a Heat Recover Ventilator will be added to the mix. These units recover 80% or more of the heat from the stale exhaust air and add it back into the fresh air entering the house. That takes a huge load off the furnace. 

Finally, we decided not to pursue LEED certification on this project. I'm still following the steps that I would have for certification, but it would have made the project more complicated and expensive. There are some great resources available to verify that a house has been brought up to proper energy standards, including the Energy Performance Score from Earth Advantage. This is a very simple and effective approach to energy auditing and reporting. There will even be a place for the score on the MLS listing if we ever sell the house.


Saturday, June 26, 2010

The Bugs

A few weeks ago, Annie noticed that a bird had built a nest in a vent on the side of our house. I'm not sure why someone put a vent on the side of the house, but it was now home to some baby birds. They sounded so cute and they made a perfect alarm clock every morning. That was all great until Annie walked into the little office room upstairs and found it crawling with hundreds of thousands of tiny little black bugs. 


It's hard to tell the size from this picture, but the thing they are crawling on is a small zipper on a plastic bag. 

We had to take all of our stuff from that room outside and every time we touched anything, they would start to swarm up our hands and arms. Annie got online and determined that they were Bird Mites, also known as Bird Lice. 

They were still coming in through the vent, so I went and removed the exterior vent cover and bird's nest while Annie cleaned the room out with water and vinegar. 




Fortunately, these things aren't hard to kill and they die or go away if they don't find a new host within a few days. We quarantined all of the items from that room outside for about a week just to be safe. 

The next surprise came when I started deconstructing the downstairs bathroom. 




It looked like there had been a slow leak behind the shower for quite a few years. The floor was rotted out and a number of studs were completed rotted at the base and not even supporting the wall anymore. As I got to removing the damaged lumber, I noticed a fine dust coming out of some of the pieces. It was a lot like sawdust. I didn't think much of it at first, but as I took things apart more, it became more apparent that something was eating the wood. 





I called a pest control company out to look at it and it turned out to be Powder Post Beetles. They seem to have only eaten around the damp wood, which is common for them, but they have been known to eat entire houses. I'm glad we caught it when we did, but it's been a lot of work fixing the framing they destroyed. 


Chance looks through the giant hole we just cut in the house, trying to figure out the next step. 



Once the affected wood was all cut out, we started piecing the house back together. 



We had to cut the rotten / eaten subfloor back a few feet and replace some joist sections.

Finally, we were able to get back to doing what we had set out to do a few days earlier. We opened up the the wall between the kitchen and bathroom and put a support beam across it. The new wall will go back about three feet into the bathroom and the extra kitchen space will house the refrigerator and give us some extra storage. 




First post in!


Deconstruction doesn't mean you don't still get to use a sledgehammer from time to time.



Finally! Now just two more beams left to do...

So the pests are all dealt with and remodeling is back on track. I'm just now finalizing the plans in Sketchup and I'll post them soon. 

Wednesday, June 9, 2010

The Initial Plans

Thank God for Google Sketchup. I can't draw plans to save my life, but Annie would kill me if I started tearing down walls without knowing the final outcome. It took me about 2 weeks to really figure the program out, but once I did, it made this whole thing a lot easier.

The first thing I did was model out exactly how the house was:

Floor 1 - 
Bottom right, entry and living room. 
Bottom left, kitchen
Top right, bizzare corner room with old gas furnace
Top middle, bedroom
Top left, bathroom with small laundry room above that


Floor 2 - 
Landing at top of stairs
Top right, office
Middle, bedroom
Left, bathroom
Top left, storage
Bottom left, attic/storage


Then we started playing around with different ideas:


The first major remodel plan was to square off the bottom floor and use the space to create a bedroom where the furnace room was and then open up the old bedroom as well as the kitchen wall to create a great room:


Early on, we had begun trying to figure out a way to move the bathroom door so it didn't open up into the kitchen. Our other house had the same problem and I really hated it. The first plan didn't include modification to the upstairs. Then it occurred to me that this could become a 3 bedroom house if we built up the corner addition to the 2nd story:


A few problems with that plan... It made the master bedroom very small and awkward and more importantly, we don't need 3 bedrooms. We bought this place because it was the perfect size for us. Again, we lost sight of that and started making big plans for an addition. This time on the other side of the house:



This plan leaves the upstairs in it's original form, but really opens up the downstairs. By knocking down the walls, we eliminate one bedroom and consequently have to add one on to the back of the house. Here is another view:


We got really excited about this design because it really created the outdoor living area we wanted as well. The roof of the addition would double as a second story deck and then we would extend it out in both directions for a big covered patio. The green area would be some sort of eco roof or rooftop garden. 

Most of this planning was done while we were in Texas. Once we got back to the house, we quickly realized once again that we didn't need to add to it. I think we were making the common mistake of wanting a house to be a certain way for resale value. The important thing is that the house is right for us. If and when we ever sell this place, the buyer can easily do what they want to it. 

So now I'm working on the final plan. There will be no addition. There will be no formal dining room. There will be a small 2nd story deck and a good sized covered patio in the back. It will remain a 1200 SF, 2 bed, 2 bath house and we will put more of our remodeling budget toward energy upgrades. 

Tuesday, June 8, 2010

The House

I was sitting in our house in Austin looking at properties for sale in Portland in August of 2009 when I came across the house:



We both got really excited and e-mailed our realtor asking him to go check it out for us. Before even hearing back from him, there were several reasons that this place seemed like a perfect fit:
  • 8,500 square foot lot with R5a zoning. Big, private back yard and zoned for an accessory dwelling if we wanted to build a small rental unit on the property. 
  • Solar orientation. The majority of the roof is south facing, giving adequate room for an array of photovoltaic (electric) and solar thermal (hot water) panels. Also, the roof overhangs looked perfectly designed to shade the south facing windows in the summer and allow the sun to heat the house in the winter. 
  • It was priced at $117,000. Our goal was to keep the purchase and remodel under $200,000. 
  • We could tell from the pictures that it was in need of some major work. It kind of defeats the purpose of sustainable building to tear apart a perfectly good house. 
  • It's walking distance to the Max Green Line, Portland's newest light rail transit line. 
Our realtor reported back to us about it and we decided to put in an offer. He determined that we would need to offer about $5,000 more than the listing price to secure the house. We did and the listing agent thought we were going to get it. Since it was bank owned at the time, the bank decided to accept a cash offer, even though it was less than ours. 

A few weeks later, the listing agent called ours and asked if we would like to resubmit our offer. The previous deal had fallen through and the bank was ready to accept ours. We resubmitted and waited to hear back. The listing agent said that she was waiting to hear from the bank and had no way to speed up their decision. 

We already had a trip planned to Portland at the end of August. We were hoping to have closed on the house by that time, but by then we were just hoping to hear back that we could buy it. When we got to Portland, we decided to drive by and see the place. It was covered in Auction signs. The bank had decided to take it to public auction without even telling the listing agent. 



On September 13th, we logged on to the auction site. There was a live auction taking place as well, but we were able to listen to it and place bids through the web site. The plugin for the site was very archaic and only made for PC so I had to run it through a Windows virtual machine on my Mac. This didn't help matters. We watched some other properties go as we tested the system out. It was barely working, but this was our last shot. When the house finally came up for auction, we watched it go up for a while before we started bidding. It was really stressful trying to time submitting a bit before the auctioneer ends it while keeping in mind the delay of bidding online. 

We finally put our last bid in at $131,250 and decided to stop. This was already a few thousand higher than we had decided to go and almost ten thousand higher than the bank had been willing to sell the house for a few weeks earlier. The page refreshed as we heard the auctioneer close it out and it said we had been outbid and that the property was sold to someone else. As auctions tend to get emotional, this was a huge let down, but it was the third time we didn't get the place so we were sort of used to it by then. 

All of the sudden, the page refreshed again and it said that we had won the auction. I'm not sure what happened, but the other bid disappeared and that was that. 


The Move

In April of 2009, our plans got sidetracked. We made a snap decision to make a temporary move to Austin, TX. I had been working as a rep for a few green building product manufacturers and selling some remodeling jobs for a contractor, but neither job was going very well. My old boss called me and needed extra salespeople because of a recent hail storm.

Annie and I talked it over and decided to go work out there for a short while. The idea was 2 - 3 months, but up to 6 if we needed to. Over a year later, we finally just moved home from Texas. I'm still working for the company, but my plan is to fly out for a few weeks at a time during the busy season (or seasons... Most of our work is storm restoration and you just never know when the weather is gonna throw a few hundred curveballs at your roof).

So for the time being, my job is to sell restoration projects half way across the country and remodel our house in between trips. I hope to use what I've learned (and am still learning) about sustainable construction to influence my company. One of my co-workers and I had been working on marketing residential energy upgrades in the Austin area and bidding on city mandated energy auditing and upgrading of multi-family complexes, but I haven't been able to stay involved lately since the company has me traveling to different offices in Texas and Oklahoma.

On a side note, I saw a really cool development in Austin. It's a community of fairly small homes, designed for net zero energy use. Half of the homes are available at market rate (starting at $190k) and the other half are available at a discount to qualified buyers as affordable housing. You can see them online at solaustin.com or follow their blog at solaustin.com/blog/.

The idea

In July of 2008, Annie and I began looking for a fixer home to buy and remodel. Having just finished a self-study of the LEED for Homes reference guide, I was feeling ready to take on a green rehab project.


Fortunately, our finances didn't allow us to buy another home at the time. Looking back, I feel that it would have been a disaster, or an expensive learning process at best. It may have gone something like this:


We got married later that year, moved into a much smaller rental house nearby, and rented our house to someone that could make use of the whole place.

Shortly after getting married, I enrolled in the Sustainable Homes Professional course with the Earth Advantage Institute. This class provided an in-depth education on sustainable building methods and materials. In addition to class room training, we toured some ground breaking building projects; Everything from a LEED Platinum, Net Zero home, to a development of modest, affordable homes built to be energy efficient and affordable.

After I graduated from the course, Annie and I had a much more clear idea on what we wanted to do and how to get it done. The idea was to find a house in need of either interior or exterior wall removal and do a LEED Silver or Gold remodel.