Wednesday, June 30, 2010

Structural changes and a stud finder that actually works

We're finally back on track for the kitchen expansion after dealing with the rotten wood and Powder Post Beetle issues. Here's a quick review of the structural changes:
  • Open up the wall between the bathroom and kitchen (done). 
  • Reinforce the opening with a 4" x 6" header beam (done). 
  • Build the new bathroom wall about 30" back. This makes space for the fridge and a pantry (done). 
  • Cut out part of the bedroom to build a hallway and a closet. The hallway will have doors into the bedroom and bathroom. 
  • Open up the wall between the kitchen and living room (done). 
  • Reinforce the opening with a 4" x 6" header beam. 

This makes a nice open space between the kitchen and living room along with a bar facing the living room side. Moving the fridge really opens the kitchen up and moving the bathroom entry away from the kitchen is a huge plus. 


Off to the Rebuilding Center with some stuff to donate. I was careful not to damage things when I removed them so that they could be used again. 


What a great place. They have just about anything you could imagine and it's all priced very reasonably.  Lately it seems like prices of salvaged materials have gone through the roof and it's nice to have a place that doesn't operate like that. 




I built the wall in two sections so that it would go through the door. This also allowed me to carefully measure the opening it was going in and account for it being out of square. It was much easier to wiggle  the two pieces in separately. 


Bam!


Ok... On to the stud finder. I've had a number of these things over the years. Some of them came free with another tool, some of them I purchased. None of them really worked. I've seen some that make claims to greatness online selling for $100 or more, which sounded like too much, but I was almost ready to try one. I decided to give the Zircon i320 OneStep a shot. It was $40 and I'm very happy with it. 



Scan started.



The bars on the screen show when you start across a stud edge. 


The bars and the red light indicate exact stud center. 



Reenactment.


It also has a deep scan mode for finding studs on the exterior, metal stud mode, and a warning if you scan over any wiring in the wall. 


*Insert stud finder joke here*

Back to the kitchen. I sheeted the new wall with 6 mil plastic and taped the edges so that I can work on the bathroom without the dust or odor getting into the kitchen. I moved the fridge to it's new home and the kitchen suddenly seemed twice as big. Now we're waiting for the stove to be delivered. 


Notice my state of the art locking mechanism on the door. I lock our shed up at night by parking in front of the doors. Some day we'll have nice things...



Future home of a big open space. 


Things are coming together nicely now after that last setback. Today, Chance and I are going to finish the concrete form for the back deck and fill it with the gravel base. Annie and I also decided that we're going to wait on the metal roof until next year, so we're going ahead with the solar panel installation as soon as the installer is ready. 

Sunday, June 27, 2010

The Final(ish) Plans

Well, it's been quite a process since the first time I measured the house out and modeled it in Sketchup. We've been through about four major designs and I have over ten models saved with at least small differences between them. The plans are now mostly finalized. I say mostly because the changes that will occur from now on will probably be based on decisions we make when we come closer to physically working on them. I've just been told by so many experienced people to plan as much as possible ahead of time, so here it goes:


Bird's eye view of the property. We don't have much planned in the way of landscaping yet, but the garden that you see on the left side is already there, as is the shed. It's a very special shed that I'll talk about later in this post. 



I just recently got Podium, a rendering plugin for Google Sketchup. I'm not very good with it yet and I really don't know why it cut off half of our fig tree, but I'll figure it out soon. 


The main change you'll see here is that the front door will be moved to the actual front of the house. Some of the odd shaped windows on that side will probably be replaced with ones that can open and the south side of the house will get another window or two. 


Rather than doing that expensive and unneeded addition, we're pouring a 12' x 21' patio outback and giving it a good, solid cover. It may rain a lot here, but it as long as you're dry, it's rarely too cold to cook and entertain outside. The upstairs deck will get rebuilt slightly bigger than it was. 



These labels are hard to read so I'll break down the floor plan:

First Story:
  • Entry (top right). Moved to where the old gas furnace was. Storage area under stairs may be used for HVAC equipment. 
  • Living Room (bottom right). Stays the same size, but the wall between it and the kitchen is almost completely opened up and a bar is put in. 
  • Kitchen (bottom left). The main difference here is that we're stealing space from the bathroom to create a nook for the fridge and some additional storage. 
  • Bathroom (top left). Entry is now from the adjacent hallway which will be created. Still a full bath, but going to standing shower only because of decreased space. 
  • Laundry Room (above bathroom). This is where the solar panel equipment will be mounted to the walls and it may have to house some of the HVAC equipment if it won't go under the stairs. 
  • Bedroom (top middle). Slightly smaller because of the new hallway. If the bedroom and bathroom doors can go more toward the front of the hallway, the back of it will be converted into closet space for the bedroom. Otherwise, we'll have to cut into the entry way. 

Second Story is pretty much unchanged for now. The only thing different about this model is that I squared off the triangle shaped piece of floor near the top of the stairs so it could be a closet. 

I feel like most of the work I'm doing and these plans for structural changes are basically bringing the house to more of a blank slate. As we approach that mark, we'll be getting more into the selection of finish products, colors, etc. Some of those things have already been discussed, decided on, or even started. Each of them will have their own post, but here is a run down of what I know so far:

Garden - This is built and planted. Right now we have about 300 SF, but we may add more later. We picked up a big variety of organic plant starts at Portland Nursery and some excellent organic soil and top dressing from Dean Innovations. 

Water Shed - This is the shed I mentioned early that sits in the far back corner of the property. I'll be going into great detail about this in another post, but it's essentially a self-contained rainwater harvesting building. The roof is designed to catch enough water to fill a 3,200 gallon tank during the rainy season, which is enough to water our garden during the rainy season. I'm involved with the creation, sales, and marketing of this product and this is our very first one. More info can be found at watersheddesigns.com.

Solar Array - The solar array pictured is a 2 KW Photovoltaic (provides electricity) set and a 2 KW Solar Thermal (heats water) set. I'll go into more detail later on about how the electric panels are tied into the power grid and how the hot water panels are tied into the heating system. 

Roof - We aren't sure about the color, but I'll be putting on a standing seam metal roof before we can mount the solar panels. 

Insulation - I haven't had a chance to study the roof / ceiling assembly yet, but I'll need to find a way to add more insulation. As for the walls, it looks like we'll be using 2" x 2" battens on the outside to increase the wall depth. We have some options at that point for insulation, but we'll probably leave the existing 4" alone and just add 2" of rigid foam board in between the battens. This, of course, will be done after ripping off the old siding, but we have yet to pick out a new siding material. 

Kitchen - We really wanted to keep the look of the kitchen warm and classic. We're painting and reusing the lower cabinets and replacing the counters with Paper Stone. The upper cabinets will be replaced with open shelving. We're going to try to refinish the old wood floors if they're salvageable. Appliances will all be white. We have the fridge already and we just bought a vintage gas stove that looks sort of like this:


Annie is very excited about the stove and we're both really looking forward to having a functional kitchen again. 

HVAC System - This is still up in the air, but what we want to put in is a forced air (ducted) system which is heated by a hydronic air handler. The hydronic air handler uses hot water running through a copper coil to heat the home's air, rather than a gas flame. Whatever system we use, a Heat Recover Ventilator will be added to the mix. These units recover 80% or more of the heat from the stale exhaust air and add it back into the fresh air entering the house. That takes a huge load off the furnace. 

Finally, we decided not to pursue LEED certification on this project. I'm still following the steps that I would have for certification, but it would have made the project more complicated and expensive. There are some great resources available to verify that a house has been brought up to proper energy standards, including the Energy Performance Score from Earth Advantage. This is a very simple and effective approach to energy auditing and reporting. There will even be a place for the score on the MLS listing if we ever sell the house.


Tuesday, June 8, 2010

The Move

In April of 2009, our plans got sidetracked. We made a snap decision to make a temporary move to Austin, TX. I had been working as a rep for a few green building product manufacturers and selling some remodeling jobs for a contractor, but neither job was going very well. My old boss called me and needed extra salespeople because of a recent hail storm.

Annie and I talked it over and decided to go work out there for a short while. The idea was 2 - 3 months, but up to 6 if we needed to. Over a year later, we finally just moved home from Texas. I'm still working for the company, but my plan is to fly out for a few weeks at a time during the busy season (or seasons... Most of our work is storm restoration and you just never know when the weather is gonna throw a few hundred curveballs at your roof).

So for the time being, my job is to sell restoration projects half way across the country and remodel our house in between trips. I hope to use what I've learned (and am still learning) about sustainable construction to influence my company. One of my co-workers and I had been working on marketing residential energy upgrades in the Austin area and bidding on city mandated energy auditing and upgrading of multi-family complexes, but I haven't been able to stay involved lately since the company has me traveling to different offices in Texas and Oklahoma.

On a side note, I saw a really cool development in Austin. It's a community of fairly small homes, designed for net zero energy use. Half of the homes are available at market rate (starting at $190k) and the other half are available at a discount to qualified buyers as affordable housing. You can see them online at solaustin.com or follow their blog at solaustin.com/blog/.